Incremental launching methodology
For the launching operation special “friction system” using hydraulic lift-push jacks is used. Alternatively, the launching can be done by means of hydraulic pulling jacks using strand or bar temporary tendons. A steel nose is installed on concrete viaducts or a temporary tower with stays on metallic decks.
MK4 is a leading company in this field having already successfully accomplished many projects of this kinds (concrete and steel structures) worldwide.
Typical scope of work (construction package) offered by MK4 includes:
- Construction design / alternative design.
- Supply and installation of temporary / permanent post tensioning.
- Supply and erection of special formwork and launching steel-nose.
- Supply of bearings (temporary/permanent).
- Launching operations and equipment.
- Supply of special sliding pads and devices.
- Bar prestessing for steel-nose and lateral guides attachment to the structure.